I look at the spot and your plans
I come out myself, look at where the footing goes and ask what you're building and how you'll use it. Then I write up the estimate so you can see what it covers before you decide.
Planning an addition, garage or porch and not sure what has to go under it? We dig, size and pour footings for your ground.

Concrete footings in La Porte, IN are the wider concrete base under a wall, a pier or a column that spreads the weight of your build into the soil, and we dig, form and pour them to fit the ground on your lot.
Most calls start with a plan for an addition, a garage, a porch or a row of piers, and a question about what goes under it. A continuous footing runs the full length of a wall, and a pad footing sits under one heavy point like a post or column. Either way it gets buried once the build goes up, so it's the one part you can't fix later.
The price comes down to how wide and deep the footing has to be, and the soil and the weight on top decide that, because weaker ground needs a wider footing and wider costs more. The schedule turns on the weather, the paperwork and whether an engineer needs to weigh in first. I'll write up your own number once I've seen the lot.
I answer my own phone, and I'm the one you'll see from the first look at your lot to the last of the cleanup. Call (219) 258-7141 or use the contact form to get started.
I come out myself, look at where the footing goes and ask what you're building and how you'll use it. Then I write up the estimate so you can see what it covers before you decide.
We're licensed and fully insured. Once you say go, we sort out the paperwork with the office that covers your address and set the pour date.
I started this business in La Porte in 2023, after learning under a boss who made us tear out anything that wasn't right. I'm on site with our crew through the dig, the pour and the cleanup, so the person who wrote your estimate is the one checking the work.
I start by finding out what's going on top and how heavy it is, then we dig and look at the soil at the bottom of the trench, because that's what the footing has to stand on. We size the width and depth to that soil and that weight, and when the build is heavy or the ground is weak, I get a structural engineer involved early so it's in the plan and the budget before anyone gets surprised. Most people would rather spend on what shows, and with a footing nothing shows. It's still the part I won't trim, because the walls above are only as good as what's under them.
Footings often come with other work. If an older foundation next to your addition has settled, foundation raising can lift it before the new work ties in. When a new footing has to go through an existing slab or floor, we use concrete cutting to open a clean section instead of breaking it out by hand.
A footing goes in four steps, and each one sets up the next, so we don't rush any of them.
We dig to the width and depth on the plan, then take a hard look at what's at the bottom. If it's softer than we planned for, we talk it through with you before the pour, not after.
Forms hold the concrete to the right shape, and rebar, the steel bars inside, helps the footing carry the load without cracking apart. Where an inspector needs to see the holes before the concrete goes in, we set the pour date around that visit.
We pick the pour day by the forecast, since cold, heat and wind all change how fresh concrete sets. If it turns cold, the protection we planned for goes on that day.
Curing is the stretch where concrete hardens and gains its strength, so nothing heavy goes on the footing until it's ready. Then we backfill around it and leave the site clean.
Call (219) 258-7141 or send the form with your property address and a short description of what you're building. We reply within one business day, then I come out, look at the spot and write up a free estimate with no obligation.
(219) 258-7141Across the US, installing concrete footings usually costs about $4 to $20 per linear foot, covering the concrete, the labor and the digging. That's the national market, not our price, and most of the spread is size, since a wider, deeper footing can cost several times a shallow one. I'll give you your own number after I've seen the lot.
Footings may need to sit below the frost line, which is how far down the ground freezes, because that helps keep freeze and thaw from heaving and shifting them. Depth isn't the whole answer, since a deep footing that's too narrow still won't spread the load into the soil. We confirm the depth your build needs with the office that covers your address before we dig.
Yes, with protection. Industry guidance counts it as cold-weather work when the air falls to 40°F, or is expected to, while the new concrete is being protected, and then the pour needs insulating covers, or enclosures and heaters when it's colder or windy, to hold the right temperature. If your schedule can wait for warmer days, that's often simpler, and if it can't, the protection goes into the plan and the estimate.
Inside the city, City of La Porte Engineering handles building permits, and applications go in online, with questions answered at (219) 362-2327. Where the county issues the permit, the county Building Commissioner can only issue one when the general contractor and any subcontractors are registered with the county. Before work starts we check with the office that covers your address, and if your job needs a permit or contractor registration, we take care of it.
La Porte County's soils formed from what glaciers, old lakes and streams left behind, plus some organic ground, and they can change a lot, sometimes within a small area. That's why I size a footing to what we find in your hole, not to what worked down the street. For buildings under the state's building code, Indiana accepts three ways to protect a foundation from frost: going below the local frost line, building a frost-protected shallow foundation, or bearing directly on solid rock.
We're based in La Porte and do the same footing work across the cities around it, from Michigan City to Westville and Valparaiso. If your city isn't listed on the site, give us a call and ask.
Once concrete sets there's no do-over, so call (219) 258-7141 or use the form while there's still time to size the footing on paper instead of in the hole.
If you've got a question about what should go under your build, send it over and I'll answer it myself.
Tell us about your project