Mon–Fri: 6 AM–10 PM, Sat–Sun: 7 AM–11 PM(219) 258-7141
La Porte Concrete CompanyLa Porte Concrete Company

Concrete driveway building in La Porte IN - a slab that drains away from your house

Cracked, sinking or pooling driveway? We dig out, pack the base and pour a new slab graded so water runs off.

Concrete driveway extends to a double garage, with a broad light gray slab divided by control joints.

What does it take to build a concrete driveway that lasts in La Porte?

Concrete driveway building in La Porte is the whole job from the ground up. We take out the old drive, dig down to firm soil, pack a base, set forms and pour a new slab on ground graded so water runs away from your house. Then you wait out the cure before you park on it.

Most calls start with something you can see. The slab has cracked across the middle, a corner has dropped by the garage, or water sits where it never used to. Usually the cause is underneath, because the base was raked level instead of dug out and packed and it settled with the dirt, or the slab was set falling toward the house and water has been getting under it for years.

Price comes down to the size of the drive, whether there's an old slab to break out and haul away, how much digging and base your ground needs, and the finish you pick. The schedule turns on the weather, the paperwork and the curing wait after the pour. You get your own figure in the written estimate I put together after I've looked at the spot.

What happens when you call about a driveway in La Porte?

It's a short list, and I'm part of every step of it.

You talk to me, and I come out

I still answer my own phone, so the person you call is the one who walks your driveway. I look at the slab, check where the water runs now and ask what you park on it and how often.

A written estimate built on your ground

I write it up from what I saw on site, so it covers the tear-out, the base your ground needs and the slab you'll actually use. I've run this business in La Porte since 2023, and I'd rather tell you what the ground needs than hand you a number that skips it.

Licensed and fully insured, with me on site

We're licensed and fully insured. Once you say go, we sort out the paperwork and set the pour date, and I stay on site with the crew until the job's done and cleaned up.

How we build a concrete driveway

We start with where the water goes, because a driveway that falls toward the house sends every rain at your foundation and under the slab. Then we dig out to firm soil instead of raking the old dirt flat, pack the base so it won't settle later, and grade it so water runs off away from the house. That's the subgrade, what the slab sits on, and nobody sees it once we pour. It's also the first thing people want to cut when the budget gets tight. I'd skip a fancy finish before I'd skimp on the base, because a nice surface on bad ground cracks like any other.

A lot of people do the driveway and the back of the house in the same season. If you want a slab out back too, our concrete patio construction gets the same ground work, and if you'd rather have a pattern or color than plain gray, ask about stamped concrete services for the drive or the walk beside it.

  • Break-out and haul-away of the old driveway
  • Digging to firm ground and a packed base under the slab
  • Grading so water runs away from the house and garage
  • Forms, steel where the slab needs it, the pour and a broom finish
  • Control joints cut on time, and a talk about parking and first-winter care before we pour

From tear-out to the first week

Here's the job itself, once the paperwork's sorted and the date is set.

  1. Break out and haul off the old slab

    We break up the old driveway and haul it away so none of it ends up under the new one. That's when we see what the ground really looks like, and anything soft gets dug out before the base goes in.

  2. Set the forms and the steel

    We stake forms to the shape and slope we marked out, so the edges and the fall of the slab land where they should. Where the slab calls for it we set rebar, steel bars that hold the concrete together if it does crack.

  3. Pour early and finish the top

    We aim to pour early in the day, because concrete placed in midday heat dries too fast and can leave a weak, dusty top later. We give it a broom finish, a light texture dragged across the surface so tires and boots grip when it's wet or icy.

  4. Cut the joints and let it cure

    We cut control joints, shallow grooves that give the slab a chosen place to crack, while the concrete's still fresh, because cut late they don't do their job. Then curing, the wait while the slab hardens and gains strength, does the rest, which is why we cover parking and first-winter care with you before the pour, not after.

Get a free on-site estimate for your new driveway

Send the form or call (219) 258-7141, and expect a reply within one business day. I'll set a time to come look at the spot, then write up a free estimate for your driveway with no obligation to go ahead.

(219) 258-7141

Questions people ask about new concrete driveways

How long does a concrete driveway last in Indiana?

Indiana's ready mixed concrete group puts a concrete driveway at 20 to 50 years with proper sealing. It costs more up front than asphalt, but the group says you get that long life without yearly upkeep. To keep it there, the concrete group in neighboring Ohio advises cleaning the surface and putting on a commercial penetrating sealer every 3 to 5 years, following the sealer maker's instructions, so plan that into your budget.

How long before I can drive on a new concrete driveway?

Keep cars off it for at least 7 days, which is what the concrete group in neighboring Illinois advises. The slab is still curing that first week, so line up somewhere else to park before the pour.

Can I use salt on a new concrete driveway the first winter?

It's best not to, because Ohio Concrete advises against deicing salts in the first year, especially on concrete placed after September. If you have a fall pour, keep sand or kitty litter by the door for traction that winter. After that, one concrete association's guide says sodium chloride, the usual rock salt, or calcium chloride is generally fine on good, dense concrete, while deicers with magnesium chloride, potassium chloride or urea have been shown to wear concrete down much faster, so read the bag.

Driveway permits and the city of La Porte

City of La Porte Engineering is the office for building permits, and you apply online through the city's building permits page or call them at (219) 362-2327. Digging in the right of way, the strip along the street, takes a Right of Way Permit, and the city lists excavation with a pavement cut separately from excavation without one, so it matters whether the end of your drive ties into the street.

The city's list doesn't settle whether every new or replaced driveway needs a permit, so before work starts we check with the office that covers your address, and when the job needs a permit we take care of it. We're based in La Porte and build driveways across the cities around it, from Michigan City to Valparaiso, and most of what we tear out has the same story of a raked base or a slab that falls toward the garage. If your city isn't listed, call and ask.

Get your driveway on the schedule

Have the address, a rough size of the drive and the season you'd like the pour when you call (219) 258-7141, so the first conversation gets you a visit instead of more questions.

If you're torn between concrete and asphalt, or just want a second look at a cracked drive, give me a call.

Tell us about your project
(219) 258-7141Get an estimate